CBH ENGINEERING HOLDING BERHAD

KLSE: 0339 (CBHB)

Last update: 4 days ago, 7:40PM

0.345

0.00 (0.00%)

Previous Close 0.345
Open 0.350
Volume 2,185,000
Avg. Volume (3M) 5,053,825
Market Cap 648,910,464
Price / Earnings (TTM) 11.50
Price / Earnings (Forward) 10.45
Price / Sales 2.11
Price / Book 3.31
52 Weeks Range
0.200 (-42%) — 0.380 (10%)
Profit Margin 15.37%
Operating Margin (TTM) 19.83%
Diluted EPS (TTM) 0.030
Total Debt/Equity (MRQ) 1.50%
Current Ratio (MRQ) 2.61
Operating Cash Flow (TTM) 18.01 M
Levered Free Cash Flow (TTM) 10.83 M
Return on Assets (TTM) 20.49%
Return on Equity (TTM) 47.01%

Market Trend

Short Term Medium Term
Industry Engineering & Construction (MY) Bullish Mixed
Engineering & Construction (Global) Bullish Mixed
Stock CBHB Mixed -

AIStockmoo Score

1.0
Analyst Consensus 2.0
Insider Activity NA
Price Volatility -1.5
Technical Moving Averages 1.5
Technical Oscillators 2.0
Average 1.00

Similar Stocks

Stock Market Cap DY P/E (TTM) P/B
CBHB 649 M - 11.50 3.31
KGB 4 B 1.62% 30.94 7.55
WCEHB 2 B - - 2.50
MNHLDG 1 B 0.15% 21.38 5.02
KENERGY 327 M 2.10% 19.83 3.40
JTGROUP 272 M - 63.00 4.03

CBH Engineering Holding Bhd is an investment holding company. Through its subsidiaries, it is principally an electrical engineering service provider and it specializes in electricity supply distribution systems, where the company undertakes the design, supply, installation, testing, commissioning and maintenance of HV, MV, LV and ELV electrical systems. It also undertakes mechanical engineering works for building systems, where this relates to the design, supply, installation, testing, commissioning and maintenance of building systems such as ACMV systems, fire protection systems, plumbing and sanitary systems as well as renewable energy systems.

Sector Industrials
Industry Engineering & Construction
Investment Style Small Growth
% Held by Insiders 78.59%
% Held by Institutions 9.62%

No data within this time range.

No data within this time range.

Date Type Details
22 Aug 2025 TheEdge CBH Engineering bags RM52.8m contract for data centre power infrastructure in Selangor
22 Aug 2025 TheEdge Ancom Nylex, APM Automotive, CBH Engineering, Comfort Gloves, D&O, Feytech, Greatech, Ideal Capital, IJM, Kossan, Land & General, M&A, MHB, MUI Properties, Pekat, Sime Darby Property, SkyWorld Development, Sports Toto, SWS Capital, Velesto, Zetrix AI
05 Aug 2025 Announcement CBH ENGINEERING HOLDING BERHAD ("CBHB" OR "THE COMPANY") - LETTER OF AWARD FROM COMPANY A TO CBH ENGINEERING SDN. BHD., A WHOLLY-OWNED SUBSIDIARY OF THE COMPANY
05 Aug 2025 TheEdge CBH Engineering unit bags RM194.7m job to supply 275kV consumer substation for data centre
21 Jul 2025 TheEdge IPO Watch: iCents listing to test market demand in tariff era; Enproserve could benefit from major plant turnarounds
17 Jul 2025 Announcement CBH ENGINEERING HOLDING BERHAD ("CBHB" OR "THE COMPANY") - LETTER OF AWARD FROM COMPANY A TO CBH ENGINEERING SDN. BHD., A WHOLLY-OWNED SUBSIDIARY OF THE COMPANY
17 Jul 2025 TheEdge CBH Engineering, NexG, Sunway, Mudajaya, iCents, Ancom Nylex, Zetrix AI, SunCon, Berjaya Corp, Kossan Rubber Industries, NationGate
17 Jul 2025 TheEdge CBH Engineering gets RM172 mil contract, first major win since listing
26 Jun 2025 Announcement Changes in Director's Interest (Section 219 of CA 2016) - MR CHEAH BOON HWA
26 Jun 2025 Announcement DEALINGS IN LISTED SECURITIES (CHAPTER 14 OF LISTING REQUIREMENTS) : Dealings Outside Closed Period
26 Jun 2025 Announcement Changes in Sub. S-hldr's Int (Section 138 of CA 2016) - MR CHEAH BOON HWA
25 Jun 2025 Announcement General Meetings: Outcome of Meeting
Show more

The support, resistance and trendline levels presented has been generated by an artificial intelligence (AI) model and should be interpreted with caution.

Portfolio

AI Template

Your price alert

Risk Profile

| | | | |
Conservative
Moderate Conservative
Moderate
Moderate Aggressive
Aggressive
Margin of Safety (EP)
Partial Profit (TP1)
Target Profit (TP2)
Maximum Loss (SL)

Disclaimer: The above is for illustrative purposes only and is NOT investment advice. Seek advice from a qualified financial professional.

Entry Price (EP)

Take Profit 1 (TP1)

Take Profit 2 (TP2)

Stop Loss (SL)

52W Range
 
52WL
 
52WH
SL
EP
TP1
TP2

All alert prices are within 52 weeks price range

Realized Profit -
Unrealized Profit -
Dividend Received 2025 -
Total Profit -
Avg. Return -
Quantity (Buy) -
Avg. Price (Buy) -
Quantity (Sold) -
Avg. Price (Sold) -
No stocks matching your criteria